Offered to Lassen Municipal Utility District (LUMD) residential customers for purchase and installation of a new, qualified Geothermal Heat Pump.
Application must be submitted within six months of purchase or installation date.
Rebate applies to existing homes only; new construction is not eligible.
All rebates are limited to 50% of cost.
Rebate and conditions
$1,000 per ton of cooling capacity (1 ton=12,000 Btuh, result is not rounded). Paid by check.
- New unit must have ENERGY STAR certification.
If assistance is needed with this application, call 855-516-2105 or email rebate@esgroupllc.com.
Allow 8 to 10 weeks to receive the rebate, if all qualifications are met.
Last Update: 5/23/24
